aerodynamic forces, astronauts, Challenger, Disaster, Ethics, International Space Station, Kennedy Space Center, launch delays, manned space program, manned spacecraft, Morton Thiokol, NASA, Solid Rocket Boosters, space exploration, space flight, Space Program, Space Shuttle, SRB, STS-51-L, Vintage Space

Thirty-two years ago today, the first in-flight deaths of NASA astronauts tragically occurred after a launch that wasn’t supposed to happen. Some have proposed that the accident was a result of NASA and their contractors being pressured for public relations reasons. The truth is that their deaths were caused by trying to make space a business venture.

Seven astronauts killed in the Challenger accident

STS-51-L crew: (front row) Michael J. Smith, Dick Scobee, Ronald McNair; (back row) Ellison Onizuka, Christa McAuliffe, Gregory Jarvis, Judith Resnik.

 Death By Impact

On 28 January 1986, seven astronauts in the Space Shuttle Challenger (STS-51-L) died as their crew compartment slammed into the Atlantic Ocean after falling 12 miles in two and a half minutes. They were not killed in the breakup of the Shuttle, nor did they become unconscious from the depressurization of the crew compartment, as suggested by NASA. Some, if not all astronauts, were aware that they were about to die and knew there was nothing they could do to avoid it.

Trail of Causes

The technical primary cause of the accident was weather-related. The Space Shuttle was not to be launched at temperatures below 4° C (39° F) and had never been launch at temperatures below 12° C (54° F.) A few hours before the launch the temperature had fallen to -8° C (18° F.)

The technical fault caused by the weather were rubber O-rings at each of the joints of the solid rocket boosters (SRB.) The O-rings needed to be warm enough to expand to seal the joint to avoid burning gases from blowing out between the sections of the solid rocket booster. The concern was that the power of the burning fuel would rupture the joint at launch and cause an uncontrolled blast of hot gases to escape causing an explosion on the launch pad.

Known Problem to NASA

After previous Space Shuttle launches some of the recovered solid rocket boosters had shown ‘blow-by’ of the O-rings. That meant that the O-rings had not completely sealed the SRB joint and could have potentially compromised the safety of the crew had the blow-by breached to the exterior of the joint.

Engineers at Morton Thiokol, the Utah contractor that designed and built the solid rocket booster, had felt that NASA was ignoring their concerns about the issues regarding the SRB joints. In an emergency teleconference meeting held the night before the launch, the engineers made it clear that the temperatures were unacceptable.

NASA decision-makers did not like the ‘no-launch’ answer and suggested that if they didn’t launch the next day, the company would be blamed for the delay. Morton Thiokol managers caved into NASA and overruled their own engineers. They gave a go for launch. Just prior to the reversal of the recommendation the general manager of Morton Thiokol said to the Vice President of Engineering, “…take off your engineering hat and put on your management hat…” It was the moment that sealed the fate of the seven Challenger astronauts.

Run NASA Like a Business

Previous space projects at NASA had been focused on spaceflight. The goal of NASA and its contractors were to safely put humans in space.

That changed after we reached the Moon. We had done the impossible and now space was less interesting and too expensive. The deflation of post-Moon public support forced NASA to find a justifiable reason to move forward. The decision was that NASA must end the exploration of space and build the ‘business’ of space. The Space Shuttle was intended to make the United States leaders in space commerce.

The Space Shuttle was built to be a reusable, frequent-launch spacecraft that would make traditional, single-use rockets too expensive and unreliable for commercial customers to use. The idea of running NASA like a business became the core value of the organization.

Delays, Delays, Delays

By January of 1986, NASA far behind its business goals. It was not launching the Shuttle frequently enough, nor was the reusability function creating the desired savings. STS-51-L was a critical point in making NASA run like a business. Delays in the launch of previous Shuttle (STS-61-C) had pushed back the STS-51-L flight twice. The launch had been pushed back four more times because of weather and equipment malfunctions.

On the Business Stage

Business is like theatre. It doesn’t matter what is going on backstage because the only thing that counts is what the audience can see. Backstage, NASA was in crisis, but if they could launch STS-51-L, they could maintain the perception that they had everything under control.

There were several public image opportunities if the launch occurred on the 28th that would be lost if it was delayed again. For Challenger and NASA, the teleconference on January 27th had only one possible business outcome. It must be launched. The engineers at Morton Thiokol didn’t know that they were up against a business mentality when they met on that night. Nor did the managers at Morton Thiokol or NASA know that they were about to kill seven astronauts. To them, it was just business-as-usual.

Events in Motion

Once the decision was made to launch events were set in motion.

  1. The cold temperatures caused the O-rings to become rigid. After the SRB’s were ignited a puff of hot gases blew through the O-rings at a point near the large external fuel tank.
  2. The joint temporarily sealed itself off from the debris of the exhaust of the burning fuel.
  3. As the Shuttle rose after launch it hit the worst wind shear ever experienced by a Shuttle and the debris sealing the O-ring broke free allowing the hot gases to burn through the joint.
  4. The flame from the joint acted as a blowtorch cutting into the external fuel tank and finally igniting the hydrogen fuel.
  5. The resulting hydrogen fuel explosion ripped the External Tank into pieces, pushing the Shuttle away.
  6. The Shuttle rolled out of its nose-forward position and was blown apart by aerodynamic forces.
  7. The crew compartment broke free of the Shuttle and continued to ascend until it lost momentum and began to fall down toward the ocean. It did not suddenly depressurize, but likely, depressurized slowly. The astronauts were jolted by the breakup, but not severely injured.
  8. At least three of the astronauts turned on personal oxygen after as the crew compartment fell. One did not, and the equipment for the other three astronauts was not found.
  9. The crew compartment fell and eventually hit the ocean, killing the seven astronauts on contact.
  10. NASA created a story that the astronauts were killed instantly, even after they knew that the events during the accident did not support the story. 

End of the NASA Manned Space Program

The Space Shuttle didn’t fly again for almost three years. It would resume flight for an additional 13 years, but it failed to meet the objectives of making space a business venture. The accident exposed the inherent issues of running a space program like a business and political pressure undermined the concept of a manned space program.

In 2011, NASA ended the United States manned space program with the last launch of the Space Shuttle. Since the last Shuttle launch, NASA has worked hard at pretending to have a manned space program by paying Russia to send U.S. astronauts to the International Space Station and producing videos of the development of the next generation of manned spacecraft. The reality is that NASA no longer can put a human in space, at won’t at any time in the near future.

Below is Vintage Space’s take on the cause of the Challenger disaster.

15 Days in January – Day 8

21 Saturday Jan 2012

Posted by Paul Kiser in Fiction, Government, History, Science, Space, Technology, US History

≈ Leave a comment

Tags

Challenger, hot gases, joint leakage, NASA, O-rings, Solid Rocket Boosters, SRB, STS-51-L, STS-51B, STS-51L, STS-6, STS-7, STS-8

(NOTE: The following is a fictionalized account of the 15 days in January 1986 leading up to the Challenger Space Shuttle Disaster. The character’s account is fictional; however, the details of weather and Space Shuttle events are based on known historical facts.)

Titusville, Florida
Tuesday, January 21, 1986
High Temp: 64° F Low Temp: 45° F

Challenger rolls out to Launch Pad 39A

Today we are having another day of cool, but clear weather with the wind out of the north. Challenger (OV-099) is still being prepped for a Friday launch and I’m just grateful that the original launch date was pushed back because of Columbia’s flight delays. Hopefully, it will be warmer on Friday, which will make the launch more comfortable for everyone watching. 

Challenger STS-6, her maiden voyage

As I said yesterday, Challenger has given us many ‘challenges.’ The fact that OV-099 was not originally intended to fly may be part of the reason she has been sometimes reluctant to leave Earth. That said, despite her temperament, Challenger  has broken new ground for the program.

After her problematic maiden voyage the second flight was relatively trouble-free. Launched on June 18, 1983, Challenger STS-7 was the first mission with a planned landing at KSC, but that had to be waved off because of weather.

Challenger in lightning storm just prior to liftoff

Challenger’s third mission (STS-8) was supposed to be in July, but because a payload issue the launch was pushed back to August 30, 1983. After a spectacular lightning show just before launch, Challenger lifted off almost on time making history as the first nighttime launch of a Space Shuttle. This feat was complimented by the first nighttime landing when Challenger returned on September 5, 1983.

1984 was a great year for Challenger. OV-099’s fourth, fifth, and sixth missions gave us the first untethered ‘space walk,’ the first Orbiter landing at KSC, the successful recovery, repair, and redeployment of an orbiting satellite, the first time seven people were launched into space, and the first time two women were in space at the same time.

Bruce McCandless II became first human satellite on STS-41B

The seventh mission for Challenger, and her first of 1985, was unusual because it was the only mission where the Shuttle had been delivered to the launch pad and then had to be pulled back to the Vertical Assembly Building (VAB.) Concerns about the reliability of a satellite in the payload bay of Challenger forced NASA to cancel the mission.

After a two month delay Challenger’s new STS-51B mission was finally launched on April 29, 1985, with the European Space Lab – 3 in its payload bay. The mission was a success with the only issue with the flight occurring after the Solid Rocket Boosters (SRB) were recovered. The left SRB had evidence that it leaked hot gases through a joint area and two rubber o-rings that were designed to sealed the joint were damaged. One ring had 4mm of erosion and the other had 8mm of erosion.

This leakage presents two issues. The first is the potential loss of pressure if the leak is too major and the second is the danger of hot gases that might be directed toward the External Tank (ET), the Orbiter, or the other SRB, which might damage them. Fortunately, this was not an issue during this flight.

Despite the SRB hot gases leakage issue on her seventh mission, the biggest scare Challenger would give us was on her eighth mission. I’ll talk about that tomorrow. 

15 Days in January – Day 6

19 Thursday Jan 2012

Posted by Paul Kiser in Fiction, Government, Science, Space, Technology, US History

≈ Leave a comment

Tags

39B, Challenger, Launch Pad, NASA, Orbiter, Space Shuttle, STS-51-L, STS-61A, Vandenberg AFB

(NOTE: The following is a fictionalized account of the 15 days in January 1986 leading up to the Challenger Space Shuttle Disaster. The character’s account is fictional; however, the details of weather and Space Shuttle events are based on known historical facts.)

Titusville, Florida
Sunday, January 19, 1986
High Temp: 73° F Low Temp: 60° F

STS-51L Challenger crew for the next launch

For most Americans Sunday should be a day of rest, but for us on the Launch Pad it is not. It’s hard to describe the workload on the Pad workers right now. This next flight will be our first off Pad 39B, which means we are breaking in a new launch pad at the same time we are trying to get the program back on schedule.

After Challenger launches we will have two launch pads operational and another one that will become operational at Vandenberg AFB in six months. We will need all three launch pads if we are going to be able to meet the needs of the ramped up space program. We are in the process of training a lot of people to staff all three launch pads but after we have a few launches under our belt it will all fall into place.

Challenger in VAB ready to be lifted

Each Orbiter goes through a series of ‘handoffs’ as it moves through the launch preparation phases. The current mission’s Orbiter, Challenger, landed at Edwards AFB on November 6, 1985, which ended its STS-61A mission. It was then prepped for riding on the back of a Boeing 747 back to Kennedy Space Center (KSC) where it arrived on November 11th. Challenger was then put in the Orbiter Processing Facility (OPF) for just over a month where it was prepped for this mission. On December 16th it was moved to the Vertical Assembly Building (VAB) where the External Tank (ET) and the two Solid Rocket Boosters (SRB’s) were mated to the Orbiter. Six days later (December 22, 1985) STS-51L rolled out to Launch Pad 39B where it is our job to prepare and maintain the ship until it launches next week.

Each ship goes through the same process. To have two launches a month, as is our goal, we will become a factory-like operation that flawlessly performs every duty, every day, 24 hours a day. We will truly be the most unique cargo operation in the world and the most vital for our country. We learn as much science and technology from every launch as the real scientists who fly our ships into space. With every new launch we are revising, updating and perfecting our skills.  Twenty years from now my children will know that their Dad was one of the people who made America the country that has the best, and possibly only, space port in the world! It makes me proud to be a part of history.

15 Days in January – Day 5

18 Wednesday Jan 2012

Posted by Paul Kiser in Fiction, Government, History, Science, Space, US History

≈ Leave a comment

Tags

1986, Challenger, Columbia, NASA, Space Transportation System, STS 61 C, STS-51-L

(NOTE: The following is a fictionalized account of the 15 days in January 1986 leading up to the Challenger Space Shuttle Disaster. The character’s account is fictional; however, the details of weather and Space Shuttle events are based on known historical facts.)

Titusville, Florida
Saturday, January 18, 1986
High Temp: 70° F  Low Temp: 61° F

STS-61C Columbia lands at night at Edwards AFB

Today was a good news/bad news day. The good news was that Columbia is back on Earth. The bad news that it didn’t come home. It’s sitting at Edwards AFB, which means it will add about a week to the turnaround time before it flies again. We just can’t seem to catch a break. The landing took place after dark after they waited as long as they could for a KSC landing attempt.

Our next launch is still scheduled for January 23, and I still don’t know how we can make it. I’m not sure anyone will be ready, but there are a bunch of smart people in air-conditioned rooms that must know more than the rest of us. Of course, Challenger won’t fly if we are not ready.

To give you an idea of the schedule we are looking at, here are the launches scheduled for this year:

1986 Space Transportation System (STS) Missions

  • January 12 (KSC) – Columbia (STS-61C) – Deploying a satellite and experiments (Completed)
  • January 24 (KSC) – Challenger (STS-51L) – Deploying satellites and experiments
  • March 6 (KSC) – Columbia (STS-61E) – Astro 1 mission
  • May 15  (KSC) – Challenger (STS-61F) – Deployment of Ulysses satellite
  • May 20 (KSC) – Atlantis (STS-61G) – Deployment of Galileo satellite
  • June 24 (KSC) – Columbia (STS-61H) – Deployment of 3 satellites
  • July 1 (Vandenberg) – Discovery (STS-62A) – Dept. of Defense mission
  • July 22 (KSC) – Challenger (STS-61M) – Deployment of TDRS-4 satellite
  • August 18 (KSC) – Atlantis (STS-61J) – Deployment of Hubble Space Telescope satellite
  • September 4 (Vandenberg) – Discovery (STS-61M) – Dept. of Defense mission
  • September 27 (KSC) – Challenger (STS-61I) – Deployment of Intelsat-4 satellite
  • September 29 (Vandenberg) – Discovery (STS-62B) – Dept. of Defense mission
  • October 1 (KSC) – Columbia (STS-61K) – Mission information not released
  • November 1 (KSC) – Atlantis (STS-61L) – Mission information not released
  • December (Vandenberg?) – Challenger (STS-71B) – Dept. of Defense mission

One down, 14 to go. 1986 is going to be a big year for NASA!

15 Days in January – Day 3

16 Monday Jan 2012

Posted by Paul Kiser in Fiction, Government, History, Science, Space

≈ Leave a comment

Tags

Atlantis, Challenger, Columbia, Edwards AFB, Kennedy Space Center, KSC, NASA, Space Shuttle, STS 61 C, STS-51-L, STS-61-B

(NOTE: The following is a fictionalized account of the 15 days in January 1986 leading up to the Challenger Space Shuttle Disaster. The character’s account is fictional; however, the details of weather and Space Shuttle events are based on known historical facts.)

Titusville, Florida
Thursday, January 16, 1986
High Temp: 69° F  Low Temp: 52° F

They waved off the Columbia landing today. Weather conditions here and at the backup landing site at Edwards AFB were unacceptable. It was drizzly here today and cloudy in California. Personally, I think that landing at Edwards should only be an emergency. When an Orbiter lands at Edwards it costs over $1.5 million dollars to get it back here and we lose a week in turnaround time. If we can’t land because the weather at Kennedy Space Center we could wait for several days and still save money and time on the recovery of the Orbiter.

Atlantis (STS-61-B) was the last mission and it landed at Edwards on October 7th and it was October 12th before it was back here. Once it got back here we had the fastest turn around in the history of the program. Atlantis was out to the launch pad by November 12th. Had it landed here at Kennedy Space Center (KSC) it would have been ready to go by November 7th. The only reason to land at Edwards is if the next launch for that vehicle will be from Vandenberg AFB, and our first launch from there isn’t going to happen until July.

STS-61-B Atlantis landing at Edwards on October, 7, 1985

Of course, delays have their costs, too. Every time we scrub a landing or launch we are wasting money because we all get paid whether the Orbiter comes or goes,…or doesn’t. Still, if we are going to prove the value of the program we need to be able to get the Orbiters back in the air as quickly as possible, and that means landing at KSC.

Fortunately, tomorrow will be warmer and hopefully dryer. It should be a good day for a landing. Columbia has been a pain in the neck. It should have been up and down by Christmas and now were almost a month later and still waiting for it to land. Once Columbia is back home we are scheduled to launch Challenger next week.  

15 Days in January – Day 2

15 Sunday Jan 2012

Posted by Paul Kiser in Fiction, Government, History, Public Relations, Science, Space, US History

≈ Leave a comment

Tags

Bill Nelson, Challenger, Columbia, NASA, Space Shuttle, STS 61 C, STS-51-L

(NOTE: The following is a fictionalized account of the 15 days in January 1986 leading up to the Challenger Space Shuttle Disaster. The character’s account is fictional; however, the details of weather and Space Shuttle events are based on known historical facts.)

Titusville, Florida
Wednesday, January 15, 1986
High Temp: 64° F  Low Temp: 43° F

STS-61-C Launch on January 12, 1986

STS-61-C, or Columbia is coming back tomorrow, pending good weather. We should have Challenger ready for launch a week after Columbia lands. It was scheduled for launch at 2:42 PM EST on the 22nd, but when they had to scrub the December launch of Columbia, they moved Challenger’s launch back a day to the 23rd.

Columbia’s main mission was to launch a communications satellite and that was a success. They have had a bunch of experiments, most of them are in the Shuttle bay, but they will have everything wrapped up for tomorrow’s landing.

Personally, I’ll be glad to have Representative Bill Nelson back on the ground. I’m not sure it’s a great idea to have the people who champion our budget in Congress to take the risk of flying in space. One mistake and we could lose all our financial support and the STS program would be over. I guess the PR people must know what they are doing.

Representative Bill Nelson with on board experiment

The next mission (STS-51-L) is also going to be a high-profile flight. We have the first ‘official’ civilian on the Challenger trip. She is our first ‘teacher-in-space.’ I wonder if this is going to be a regular thing from here on out. I understand we need the public’s support and I guess this is the best way to get it. Still, I think people just need to accept that our leadership in space makes us technologically superior here on Earth. Let us do our jobs at NASA and our country will reap the benefits in advanced scientific and engineering knowledge.

We had some fog today, but this morning was a little warmer. Yesterday’s low was too close to freezing for Florida. Our farmers don’t like it when we get that cold. Hopefully, we’ve had our cold snap for this winter.

Other Pages of This Blog

  • About Paul Kiser
  • Common Core: Are You a Good Switch or a Bad Switch?
  • Familius Interruptus: Lessons of a DNA Shocker
  • Moffat County, Colorado: The Story of Two Families
  • Rules on Comments
  • Six Things The United States Must Do
  • Why We Are Here: A 65-Year Historical Perspective of the United States

Paul’s Recent Blogs

  • Dysfunctional Social Identity & Its Impact on Society
  • Road Less Traveled: How Craig, CO Was Orphaned
  • GOP Political Syndicate Seizes CO School District
  • DNA Shock +5 Years: What I Know & Lessons Learned
  • Solstices and Sunshine In North America
  • Blindsided: End of U.S. Solar Observation Capabilities?
  • Inspiration4: A Waste of Space Exploration

Paul Kiser’s Tweets

Error: Twitter did not respond. Please wait a few minutes and refresh this page.

What’s Up

July 2022
S M T W T F S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Jun    

Follow Blog via Email

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 1,649 other subscribers

Create a website or blog at WordPress.com

 

Loading Comments...